New Literature

EP1brModel EP1 Brochure

Packaged Pump System brochure has been expanded to include an overview of two installations.

 

 

New Technical Updates

The following technical documentation has been updated in the past 90 days:

 

New Video!

City of Southside, AL Selects EBARA Packaged Pump System for Emergency Lift Station Rehab!

New Literature

Packaged Pump System, Model EP1 Application Story:

  • Application Story: City of Southside, AL – CDG Engineers & Associates worked with The Eshelman Company to select and install an EBARA EP1 duplex packaged pump system to replace the existing self-priming system that failed. The case study provides an overview of the challenges the end user faced and describes the unique benefits of how the packaged pump system expedited, simplified and provided a cost effective solution. Download to read more!

 

New Technical Updates